Chapter 277
Chapter 0277 – Transformation Completed, Final Test!!
The renovation was carried out by the eighteenth day.
Li Yueming finally rearranged all the circuits in Mr. Wu’s house.
He was two days away from his expected completion of the renovation.
Next, the last soft decoration aspects of the house were not completed in the live broadcast room, and a group of viewers were stunned by the progress of his transformation during this time.
“This efficiency, no one!”
“Why do you feel that most of the transformation during this period was supported by Teacher Li alone?”
“Although the other workers are also working hard, Nima’s feeling that the efficiency of the two or three together is not as high as that of Teacher Li!”
“It seems that this time, in order to be able to complete the transformation as soon as possible, Teacher Li also fought hard, and really began to reduce the dimensionality in all directions by any means!”
“Teacher Li: You all get out of the way, let me do C for this round of transformation!”
“Hahahahaha, the specific transformation and manual work should have been the responsibility of the workers, but now Teacher Li directly rubbed a group of workers on the ground.”
“You can feel the despair of the workers and masters across the screen!”
Many viewers in the live broadcast room are afraid that the world will not be chaotic.
All of them grinned.
In front of the camera, Li Yueming and a group of workers were already finishing painting the floor and walls.
Because time is tight.
The paints used by Li Yueming are all the latest styles of quick-drying paints.
This thing is smeared on the wall, and it only takes less than half an hour to directly dry the four walls of the room, all of which are layer after layer of sound insulation material.
Because Tian Tian makes a lot of noise in the room every day.
In order to put the sound insulation in place, so that the noise does not disturb the surrounding neighbors.
Li Yueming’s efforts in sound insulation and noise reduction are also huge.
Even, just to do sound insulation, I made a sound insulation layer of about 30 centimeters.
Even the sound transmission and vibration of the water pipe, Li Yueming was wrapped in a layer of tight sound insulation material.
The real meaning is to achieve all-round sound insulation without dead angles.
The specific manifestation is that although Li Yueming’s side is carrying out bold construction, whether it is upstairs or downstairs, or the neighbor next door.
Not much noise was heard.
Even when drilling the wall with a power tool, no sound is transmitted to the next-door neighbor’s house.
The sound insulation material also has a certain fire and moisture protection function.
Above the soundproofing material, Li Yueming also laid a floor heating system.
The role of this system is to transport the central heating of the northern city through the pipes to the rooms.
In this way, even in the cold winter, the room can maintain a relatively suitable temperature.
The floor temperature is always a comfortable and uniform temperature.
Even if Tian Tian likes to take off his socks and walk around, he doesn’t have to worry about catching a cold.
The ground is covered with two floors, one soundproofed and one heated.
Further up is Li Yueming’s custom-made special elastic floor.
This floor is extremely anti-slip and anti-friction, whether scraped with a knife or ground with stone.
Floor wear is more wear-resistant than conventional flooring.
Not only that, but this floor also has a certain elasticity.
Stepping on it, ordinary wooden floors may be hard.
However, this resilient floor does not have much anti-shock force.
Tian Tian likes to stomp his feet.
According to Teacher Wu, when he stepped down, he even cracked the soles of his feet.
After installing this kind of floor, Tian Tian no longer had the same strong countershock force when he stomped his foot.
And that’s just the decoration on the ground.
On the walls, Li Yueming painted them.
The stucco paint used is also a special material.
The inner layer is magnetic paint.
This layer of magnetic paint surrounds part of the house.
A layer of colorless and odorless environmentally friendly paint is also added to the outside.
Eco-friendly coatings have the advantages of fast drying, no hazard, and no peculiar smell.
After drying, you can also scribble on it at will.
If the graffiti is not needed, it can be wiped directly with water.
These were all specially selected for Tian Tian after Li Yueming thought about it for a long time
In order to make her feel more comfortable in this room, of course, these are just some of the special features of this house.
There are many more features that will not be apparent until the official renovation is completed.
In the intense renovation process.
Soon, Suzhou ushered in the first snow of early winter.
When Li Yueming saw the white snow drifting outside the window.
His expression was still in a trance for a while.
He remembered that when he first took over Mr. Wu’s house, there was still a trace of tail on a hot summer day.
Unexpectedly, in the blink of an eye, only twenty days later, the weather in Suzhou ushered in the middle of winter.
However, the weather in the north is often difficult to use the common sense of his southerners.
Walked to the windowsill and picked up a little snow with my hand.
Refreshing and cool feeling.
In the live broadcast room, a group of viewers exclaimed: “Wow, it’s actually snowing, the weather is obviously very good on our side!” ”
“Time flies so fast, in the blink of an eye, the fourth transformation is almost coming to an end!”
“Upstairs, you went to the wrong set, right? The fourth round of transformation ushered in the end, only Mr. Li was alone! ”
“Other designers are still under construction!”
“Oh? Is that so? I thought Mr. Li’s transformation speed was very slow! ”
“Versailles should also have a limit!”
“Teacher Li’s side face with his hand to catch the snowflake is also too handsome, what a sense of thought!”
“Screenshot, it’s cold, Teacher Li’s photo warms me a Tong Ji!”
Standing in front of the windowsill, Li Yueming reached out and caught some crystal snowflakes.
The gloomy sky dome is like the most gorgeous stage for these elves.
They sing, dance, and float around with joy.
Today is the twentieth day of the fourth round of transformation.
Li Yueming’s transformation has been basically completed.
Now there are some basic tests, if there is no problem, you can officially hand over the house tomorrow.
Yesterday, Teacher Wu called the program group again.
Miao Miao’s mood has become more and more irritable recently.
Restless in the newly moved home, often getting up in the middle of the night crying and howling around.
In order to take care of her, Teacher Wu was also exhausted.
Although Teacher Wu subjectively did not want to urge Li Yueming.
But from an objective point of view, early delivery has become an imminent matter.
If it weren’t for knowing Li Yueming’s recent transformation speed.
It is estimated that the official of the dream reform program group may come to urge Li Yueming to hurry up.
Fortunately, the house has almost been renovated today.
Hope everything goes well.
Come to your senses.
Li Yueming retracted the outstretched hand on the balcony.
He turned his head to look at a group of workers behind him with torch-like eyes.
He naturally knew what this group of people was expecting.
Come to the door.
Li Yueming shouted: “Hi, little Bidou! ”
Soon, the intelligent AI called ‘Little Potato’ in the room responded: “Hello, what are the orders?” ”
Li Yueming said briefly: “Turn on the living room light, turn on the living room floor heating!” ”
The intelligent AI was silent for two seconds, apparently recognizing Li Yueming’s voice: “Okay, the living room light has been turned on, and the living room floor heating has been turned on!” ”
Next second.
The chandelier in the living room is automatically connected to electricity, and the interval between is very short.
Obviously, the latency of this intelligent system is very low.
The recognition of human speech is also very accurate.
Li Yueming took off his shoes and put them in the shoe cabinet next to him.
Next, all he has to do is check all the functions of the entire room.
Ensure that all functions in each area are working and functioning.
And behind him, a group of workers also followed behind his ass.
Look at all this with a bit of admiration.
At the beginning of construction, they did not have a deep impression of Li Yueming’s design.
But the further down they worked, the more they could feel the difference in this house.
Although Li Yueming’s design was not specially created for them.
But through some details, they can also see the subtlety of Li Yueming’s design.
It can be said that heifer takes a plane, and it is not an exaggeration to go to the sky.
As a worker, to be able to participate in such a wonderful renovation project.
The inspiration and shock to them is also unique.
In order to save time, all the hard parts in Li Yueming’s house are spliced and assembled.
Not only that, the use and understanding of various building materials.
Li Yueming also showed them what a professional designer is.
It can be said that this short twenty days has refreshed their life experience in previous decades!
Pill.